This office development had a long history of planning negotiations. Planning permission was obtained by other architects prior to our client purchasing the site.
T.N.P.P. was commissioned to take the building as designed, change its construction from in-situ brickwork and concrete frame to pre-cast panel brickwork and steel frame. This method of construction being more suitable for the fast-track method of building procurement that the client wished to use.
This fast-track system was based upon a contract/site management consultant team that controlled the site by letting of all works directly to specialists contractors.
The change of construction also coincided with a change to use national building regulations in inner London.
Portfolio
- All 98
- [FILTER X] to close menu 1
- 1.RESIDENTIAL 56
- 2.SCHOOLS 10
- 6.Noodles 1
- 7.OTHER PROJECTS 16
- 9.INFORMATION 20
- Add Storey 3
- ALL.BUILDINGS 41
- APPEALS won 4
- Contemporary Home 13
- Country Home 9
- Detached 33
- Duplex 1
- Eco Home 5
- Extension 37
- Front Dormer Windows 4
- Garden Building 6
- Garden Design 3
- Graphics 1
- Green Belt 8
- Innovative Home 11
- Large Home 29
- Listed/Conservation 14
- New Build 10
- Permitted Development 15
- Permitted.Dev + 9
- Restoration 6
- Retirement 3
- Self-Build 10
- Semi-Detached 16
- Small Home 6
- Terraced 5