This office development had a long history of planning negotiations. Planning permission was obtained by other architects prior to our client purchasing the site.
T.N.P.P. was commissioned to take the building as designed, change its construction from in-situ brickwork and concrete frame to pre-cast panel brickwork and steel frame. This method of construction being more suitable for the fast-track method of building procurement that the client wished to use.
This fast-track system was based upon a contract/site management consultant team that controlled the site by letting of all works directly to specialists contractors.
The change of construction also coincided with a change to use national building regulations in inner London.
Portfolio
- All 91
- [FILTER X] 2 close menu 1
- 1.RESIDENTIAL 51
- 2.SCHOOLS 10
- 6.Noodles 1
- 7.OTHER PROJECTS 16
- 9.INFORMATION 19
- Add Storey 2
- ALL.BUILDINGS 41
- Contemporary Home 12
- Country Home 9
- Detached 32
- Eco Home 4
- Extension 34
- Front Dormer Windows 3
- Garden Building 3
- Garden Design 3
- Green Belt 7
- Innovative Home 9
- Large Home 28
- Listed/Conservation 13
- New Build 8
- Permitted Development 14
- Permitted.Dev + 8
- Restoration 5
- Retirement 3
- Self-Build 10
- Semi-Detached 14
- Small Home 6
- Terraced 3