This office development had a long history of planning negotiations. Planning permission was obtained by other architects prior to our client purchasing the site.
T.N.P.P. was commissioned to take the building as designed, change its construction from in-situ brickwork and concrete frame to pre-cast panel brickwork and steel frame. This method of construction being more suitable for the fast-track method of building procurement that the client wished to use.
This fast-track system was based upon a contract/site management consultant team that controlled the site by letting of all works directly to specialists contractors.
The change of construction also coincided with a change to use national building regulations in inner London.
Portfolio
- All 99
- [FILTER X] to close menu 1
- 1. All Buildings 42
- 2. Residential 56
- 3. Garden Design 3
- 4. Information 19
- 5.Non Residential 15
- 6. Photo Galleries 3
- Add Storey 3
- China 1
- Contemporary Home 13
- Country Home 9
- Detached 33
- Duplex 1
- Eco Home 5
- Extension 37
- Front Dormer Windows 4
- Garden Building 6
- Graphics 1
- Green Belt 8
- Innovative Home 11
- Large Home 29
- Listed/Conservation 14
- New Build 10
- New Zealand 1
- Permitted Development 15
- Permitted.Dev + 9
- Planning Appeals Won 4
- Restoration 6
- Retirement 3
- Schools 9
- Self-Build 10
- Semi-Detached 16
- Small Home 6
- Terraced 5